Work Party Today (Dec 14) -- Time Pushed Back to 1:00
For Kiko’s Corner Seawall Project
Due to the rain this morning, we are adjusting the time for the work party to 1:00 pm pizza / 1:30pm start project.
According to our resident weather expert, the rain is expected to stop promptly at 1:30 and we should be able to get a good amount of work done. The added benefit of this rain --- the ground will be soft and easier to dig! How fortunate!
TODAY, Saturday, December 14th
Pizza will be provided at 1:00 at the Clubhouse
Work party starts at 1:30
We will install the silt fencing around the work area (just above the water line). Additionally, all boats, trailers and work materials must be moved out of the area out of the area.
Please bring the following items:
- Work gloves
- Safety Glasses
- Boots / shoes that can get wet and muddy
- Rain gear
Additionally, please bring any of the below tools if you have:
- Pickaxes
- Box knives
- Electric or battery powered drills
- Electric or battery powered hammer drills
- Wood drill bits
- Concrete drill bits for the concrete anchors
Additionally, if you have any of the below items around your house that you are looking to get rid of, please let Joe Hilliard know if you can bring:
- 6 small bales of straw
- 120 feet of treated 2x4 in various lengths – we can use lengths of wood as short as 3-ft long
- 100-feet of silt fence
- 16 – 8” or 12” concrete blocks
- Expansion anchors or Titen concrete anchors- minimum ½” diameter x 5” long we need approximately 40 of these.
- 10 lbs of minimum 3” long exterior star headed screws
|